Smokestack Demolition Goes Wrong


The demolition of the former Ohio Edison Mad River Power Plant’s 275-foot smoke stack in Springfield, Ohio, went awry because the demolition crew failed to notice a crack in the structure. The collapsing tower knocked down a pair of high-voltage electrical power lines and smashed into a building housing generators. Luckily no one was injured.



See next pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>